Dairy

Replacing 200 W fixtures in a lactating barn

A Junlebao lactating barn swapped 180 fittings at 200 W for 300 Hullray T21 fittings at 60 W. Load fell from 36 kW to 18 kW. Reported milk yield rose 12% (4.1 kg per cow per day).

Junlebao Dairy Group · China

Fixtures200 W down to 60 W
180 → 300
Connected load−50%
36 → 18 kW
8-year electricity savings
$43,285
Milk yield4.1 kg per cow per day
+12%

The retrofit

Junlebao is based in Shijiazhuang. This barn is in China.

180 legacy 200 W industrial fittings became 300 Hullray T21 fittings at 60 W. Connected load went from 36 kW to 18 kW.

Electricity is shown as $14.8 a day, $5,411 a year and $43,285 over eight years. Eight-year energy cost is $86,569 on the legacy system and $43,285 on Hullray T21.

Light in the barn

Efficacy moved from 110 lm/W to 150 lm/W. Flicker index moved from 1.2 to below 0.4. Color temperature moved from 6500 K to 5000 K.

Feeding alley: 65 lx to 213 lx, uniformity 0.42 to 0.80.

Milk yield

Reported yield moved from 34 kg to 38.1 kg per cow per day, up 12% and 4.1 kg. Feed-to-milk ratio moved from 1.45 to 1.37.

A 100-cow illustration at $0.51/kg is about $209 a day, $63,745 a year over 305 days, and $509,960 over eight years. It is an illustration, not measured farm revenue.

200 W industrial vs Hullray T21
Parameter200 W industrialHullray T21
LED3030 SMD3030 ceramic
Power200 W60 W
Efficacy110 lm/W150 lm/W
CCT6500 K5000 K
Flicker index1.2<0.4
IK rating—IK08
IP rating—IP67 / IP69K
Light decay20% in 3 years20% in 8 years
Warranty3 years8 years
Lamp life50,000 h70,080 h
Hydrogen sulfide resistance—168 h · 40 °C · 15 ppm

The hydrogen sulfide figure is the Cevonic corrosion test: 168 h at 40 °C and 15 ppm.

Milk yield reflects whole-farm performance after the lighting upgrade and is not attributable to lighting alone. Production also depends on genetics, nutrition, feeding, environmental control, and herd health.

Ask about a similar configuration.